As my mentor, Mike Holmes , often says when confronted with the aftermath of a shady contractor. I first cut a small entry hole in the kitchen/living room/fireplace wall. I was hoping that would be enough to be able to install the new Selkirk chimney. Alas, once that was open it became readily apparent that more deconstruction was going to be necessary. The through ceiling fittings were installed first and then the studding was installed over them with a bunch of drywall and loose aluminum panels - presumably to act as a fire break. So I couldn't get the old stuff out. The old chimney wasn't framed in either - it was basically just hanging off of some 1/2 " plywood. Aluminum panels which were stapled onto gypsum board had fallen off. Don't know how good aluminum sheeting is as a fire break anyway. The way it was studded inside there wasn't the required clearances to the chimney. Some restructuring required. So we decided to just get rid of the whole thing. ...